Home /

Enterprise performance

Water Supply System Reconstruction Project-Jingjiang Waterproof Factory

Water Supply System Reconstruction Project-Jingjiang Waterproof Factory

 

The Jingjiang Water Treatment Plant is operated by Jingjiang Huahui Water Affairs. It has a total designed capacity of 150,000 m³/day and employs an advanced treatment process consisting of pre-ozonation, coagulation-sedimentation, V-type filtration, ozone contact oxidation, activated carbon filtration, and disinfection. The facility includes reserved space for future membrane treatment units and clear-water storage tanks. Raw water is sourced from the Yangtze River (via the Yaqiaogang Water Intake Plant). The plant serves the entire urban area, townships, and industrial parks of Jingjiang, providing water for both industrial and residential use.

 

The water supply system reconstruction project of Hua Hui Water Co.,Ltd.is located in Jiang Waterproof Factory,Jingjiang City,Jiangsu Province,in which the procurement and filling of activated carbon filter media for carbon filter was won by Shanxi Xinhua.Among them,activated carbon can effectively treat and adsorb pollutants in water,improve the quality of effluent and prevent pollution.At present,the filling work has been completed in an all-round way,and it has been well received by the design and construction party,the Jiangfang Project Department of Shanghai Municipal Government College,and the owner,Hua Hui Water Co.,Ltd.

Advanced Treatment and Reconstruction Project of Taihe Waterworks in Shanghai

 

Operated by Shanghai Chengtou Water, the Taihe Waterworks in Shanghai has a total designed capacity of 1 million m³/day. It employs a treatment process consisting of conventional treatment followed by an advanced treatment stage using ozone and activated carbon. The upgrade project for this advanced treatment system passed its completion inspection in 2021. The facility draws raw water from the Qingcaosha Reservoir and serves the southern part of Baoshan District, the northern part of Jing'an District, the majority of Putuo District, and the southwestern part of Jiading District, providing water for both residential and industrial use.

 

The procurement and filling of activated carbon filter material in the south pond of carbon filter in the advanced treatment and reconstruction project of Shanghai Taihe Waterworks was won by Shanxi Xinhua The activated carbon in the project is produced under specific carbonization and activation conditions,and the process is all controlled by computer,which can effectively ensure the stability of 

the effluent quality and the effluent can meet the drinking water standard.At present,the filling work has been completed in an all-round way,and the project department of Taihe Waterworks of Shanghai Municipal Design  Institute  and  the  owner,Shanghai  Chengtou  Water  Supply  Taihe  Waterworks,have won unanimous praise.

 

Advanced Treatment and Reconstruction Project of Taihe Waterworks in Shanghai
 Water Supply System Reconstruction Project-Jingjiang Waterproof Factory

Expansion and Advanced Treatment Project of Jiading Yongsheng Waterworks

 

 Jiading Yongsheng Water Treatment Plant is a facility under the Shanghai Jiading Water Supply Co., Ltd. Spanning an area of ​​approximately 195.8 mu, the plant has a designed water supply capacity of 300,000 cubic meters per day upon the completion of its third phase. Its purification process consists of conventional treatment supplemented by an advanced treatment stage utilizing ozone and activated carbon. This advanced treatment system was completed and put into operation at the end of 2023. The treated water meets the requirements set forth in the "Standards for Drinking Water Quality" (GB 5749-2022). The raw water for the plant is sourced from the Chenxing Reservoir on the Yangtze River and is delivered via the Huating Raw Water Plant. 

 

The procurement and filling of activated carbon filter materials in the deep treatment and renovation project of Xinghuo Water Plant were awarded the bid by Shanxi Xinhua.The activated carbon in the project has strong adaptability to changes in water quality,temperature,and quantity,and has a good removal effect.The filling work has been fully completed and received unanimous praise from all

aspects

Water supply system reconstruction project-Jingjiang Hexing Waterworks

 

Jingjiang Hexing Water Treatment Plant, a facility under Jingjiang Huahui Water Affairs Co., Ltd., was completed and put into operation in 1998. It has a designed water supply capacity of 100,000 m³/day and employs a treatment process consisting of pre-ozonation, coagulation-sedimentation, sand filtration, advanced treatment via ozonation and activated carbon, and disinfection. The treated water meets the requirements of the *Standards for Drinking Water Quality* (GB 5749-2022). The plant draws its raw water from the Yangtze River—supplied via the Yaqiaogang Water Source Plant—and is responsible for the water supply to the central urban area of ​​Jingjiang City.

 

The water supply system reconstruction project of Hua Hui Water Affairs Co.,Ltd.is located in

Hexing  Waterworks,Jingjiang  City,Jiangsu  Province,in  which  the  procurement  and  filing  of activated carbon filter materials for carbon filter were won by Xinhua,Shanxi Province.At present, the filling work has been completely completed,and the activated carbon has successfully treated the water quality,reached the drinking standard,and effectively reduced the chromaticity of the water.

This project was wellreceived by the design and construction party:Hexing Waterworks Project Department of Shanghai Municipal Design Institute and the owner:Hua Hui Water Co.,Ltd.

Water Supply System Reconstruction Project-Jingjiang Waterproof Factory
​​​​​​​

Advanced treatment and reconstruction project of Xinghuo Waterworks

Advanced treatment and reconstruction project of Xinghuo Waterworks

 

The water treatment plant of Shanghai Xinghuo Sino-French Water Supply Co., Ltd. has a total designed capacity of 100,000 m³/day. The first phase, with a capacity of 60,000 m³/day, utilizes an ozone-activated carbon treatment process and has been in operation since 2015; land has been reserved for a second phase with a capacity of 40,000 m³/day. The plant draws its raw water primarily from the Huangpu River, with Jinhui Harbor serving as an auxiliary water source. It supplies water to the Xinghuo Development Zone in Shanghai’s Fengxian District and the surrounding areas, catering to both industrial and residential needs.

 

The procurement and filling of activated carbon filter materials in the deep treatment and renovation project of Xinghuo Water Plant were awarded the bid by Shanxi Xinhua.The activated carbon in the project has strong adaptability to changes in water quality,temperature,and quantity,and has a good removal effect.The filling work has been fully completed and received unanimous praise from all

aspects.

Equipment procurement project of Lingang Waterworks and ex-factory works

 

The first phase of the Lingang Water Treatment Plant has a designed capacity of 200,000 m³/day, with a long-term planned total capacity of 400,000 m³/day. The facility employs a comprehensive water purification process—consisting of pre-treatment, conventional treatment, advanced treatment (ozone and activated carbon), and provisions for the future integration of ultrafiltration membranes. It officially began supplying water to the grid in January 2023. Sourcing raw water from the Qingcaosha Reservoir, the plant primarily serves the southern area of ​​the Lingang New Area while extending its reach across the entire Lingang New Area, catering to both industrial and residential water needs.

 

In the procurement project of Lingang Water Plant and factory engineering equipment,Shanxi Xinhua won the bid for the procurement and filling of activated carbon filter materials.The activated carbon in the carbon filter can fully contact with harmful substances in the water plant,adsorb impurities in the water to a greater extent,thereby purifying water quality,effectively reducing water chromaticity,improving water purity,and reaching the level of drinking water.The filing work has been fully completed and received unanimous praise from all aspects.

Equipment procurement project of Lingang Waterworks and ex-factory works